This week we are completing the building project we practiced for last week.

Well done everyone who got stuck in and had a go – you know how much everyone will need to be involved this week.

From the practice you will remember:

  • We need as much time as possible to get it done.
  • Everyone will be busy and involved
  • The ground is VERY wet

So, this week please make sure to:

  • Arrive BEFORE 7.00pm – please arrive at 6.55pm at the latest so that we can START at 7.00pm. When you arrive please come straight into the building and don’t go outside, we need everyone inside at 7pm to be able to start.
  • The logs are heavy – you NEED tough gloves, preferably gardening gloves to protect your hands. Please name them so we can give them back to the right person if they get lost.
  • The ground is waterlogged so canvas shoes aren’t going to work very well – boots are better and we strongly suggest everyone wears that kind of foot wear.

A head torch will be a good addition but it isn’t required. Again, weather looks good for this week but it will be cool so plan for low temps.

See you 6.55pm Tuesday!